In the IEEB project, the work is organized in the following six different work packages:
| WP name | Leader | Participating | Work (tasks) |
| WP1 Management, coordination and communication | Oulu UAS | all | Content management Financial management Co-operation, meetings |
| WP2 Status - existing practices, standards and improved methods for field measurement | UU | Oulu UAS: T1, T2 NORUT: T1, T3 LTU: T1, T3 |
T1: State of the art investigation of practices and standards for field measurements and analytical methods for air tightness and energy consumption investigations of wooden and concrete family buildings. T2: Identification of a simplified field measurement method for building air tightness in family houses. T3: Identification of a simplified field measurement method for energy consumption in family houses. |
| WP3 Measurements and measurement methods verification | Oulu UAS | UU: T1... NORUT: T3 LTU: T3 |
T1: Measurements of air tightness T2: Field measurements of planned ventilation airflows vs. air tightness. T3: Effects in energy consumption by surrounding factors (wind, snow, irradiation) |
| WP4 Energy saving improvements for wooden buildings | LTU | LTU: T1-T5 OUAS: T1&T3 UU: T2,T4,T5 |
T1: Energy consumption in timber framed buildings (for existing buildings) T2: Survey of housing design T3: Targeted measurements for design improvements (heat leakage, leak-proof) T4: Design proposals T5: Maintenance strategies (life-cycle) |
| WP5 Sustainable energy efficiency in concrete buildings | NORUT | Oulu UAS LTU UU participate in various tasks |
T1: Allocation of energy consumption in buildings (passive energy level)
T3: Simulation and verification |
| WP6 Knowledge transfer Dissemination of results, Exploitation | LTU | Oulu-BSO all LTU UU participate in various tasks |
T1: Knowledge transfer to industry T2: Best practice description T3: Standards T4: Scientific publication |